Kesme - Hydroelectric Power Plant
Kesme Hydroelectric Power Plant was built in Pazarcık district of Kahramanmaraş province in 2011. Total power is 4.852 MWm and 16.077 GWh energy is produced annually.
Project Detail
Total Power | 4.852 MWm – 4.609 Mwe |
Annual Total Production | 16,077 GWh |
Types Of Turbine | Horizontal Kaplan |
Flow | 23 m3 |
Mechanical Power | 2 X 2,426 MWm |
Electric Power | 2 X 2,3047 MWe |
Year Of Construction | 2011 |