Gündoğan - Solar Power Plant

Gündoğan Solar Power Plant was built in 2017 in Ceyhan district of Adana. The total power capacity is 17.450 KWp and 29.000 MWh of energy is produced annually.


Project Detail

Gündoğan SPP I Gündoğan SPP II
Total Power 8.294,4 KWp 9.158,4 KWp
AC Power 7.000 KW 8.000 KW
Annual Total Production 13.500 MWh 15.500 MWh
Total Area Place Place
Orientation South 20 Degrees South 20 Degrees
Module First Solar 120W First Solar 120W
Totale Module 69.120 Pieces 76.320 Pieces
Driver Sungrow SG60KTL Abb Trio 50
Total Driver 112 Pieces 160 Pieces
Year Of Construction August 2017 December 2017